Permafrost Mining Machinery Upgrade Program – CIS Region
Mining & Heavy Construction
CIS Region (Confidential)
2025 Q1 – Ongoing
A top-tier CIS-based mining group operating over 300 heavy equipment units partnered with SINOMACH to upgrade its aging fleet and improve productivity under extreme cold weather conditions. The project marks a major step in transforming the group's mining operations with reliable, high-performance equipment engineered for permafrost environments.
✅ Batch Delivery: 20+ units of SINOMACH 220–270HP motor graders delivered in February 2025
✅ Strategic Expansion: Additional orders signed for 50-ton excavators, 8-ton loaders, and 420HP bulldozers to support multi-mine deployment
Engineered for -35°C operations with high engine adaptability
Delivered 17% more daily productivity than competitive brands in frozen ground conditions
Proven wear-resistant blade technology reduced permafrost processing costs by 23%
4-hour onsite response time via regional parts centers
Tailored maintenance programs for round-the-clock mining applications
Client Purchasing Director: “One SINOMACH replaces three of our old machines.”
A 3-year strategic procurement agreement was signed, ensuring continuous cooperation and upgrade cycles
📊 2025 Q1 Performance
98% attendance rate for the first batch of graders (as of February 26, 2025)
Single unit achieved 600+ hours of zero unplanned downtime
Client recognition for cost-efficiency and reliability
“The wear-resistant blades reduced our permafrost handling costs by 23%.”
– Mine Operations Director
The CIS mining partnership is set to grow through full-fleet renewal and deeper integration of SINOMACH’s cold-climate engineering solutions, laying the groundwork for efficient, scalable mining in permafrost zones.
📌 Interested in reliable mining machinery for extreme conditions?
Explore our Cold Climate Equipment Solutions or Contact Us for tailored support.